Kitchen · Full refurbishment

Kitchen Refurb

Full rip out, new sub-floor installation, new electrics, new kitchen and tiling.

This kitchen needed a complete reset. The existing space showed long-term damp damage, tired fittings and services that could not support a modern layout — so the brief was a full rip out, not a cosmetic refresh.

We stripped the room back to structure, installed a new sub-floor, rewired for a contemporary kitchen layout, and rebuilt with moisture-resistant boarding before fitting a new kitchen and completing the tiling. The result is a bright, hard-wearing family kitchen with clean lines, practical storage and finishes that will hold up to daily use.

Works were sequenced carefully: demolition and services first, then floor and fabric, then joinery, appliances and final decoration — so each trade could finish cleanly without undoing the last.

We had lived with a damp, tired kitchen for years. HASKO stripped it back properly and gave us a room that finally feels solid, bright and easy to live with.

James Whitaker

Transformation

Before & after

Drag the handle to compare this transformation.

Drag handle to compare

Kitchen transformation before Kitchen transformation after Before After

Kitchen transformation

Full rip out to finished kitchen
Damp wall to clean finish before Damp wall to clean finish after Before After

Damp wall to clean finish

New fabric, electrics and tiling
Strip-out to fit-out before Strip-out to fit-out after Before After

Strip-out to fit-out

New sub-floor, services and kitchen install
First fix to kitchen fit before First fix to kitchen fit after Before After

First fix to kitchen fit

Boarding, electrics, then cabinets
New sub-floor to finished room before New sub-floor to finished room after Before After

New sub-floor to finished room

Structure through to tiling
Services strip to final detail before Services strip to final detail after Before After

Services strip to final detail

Boiler area rebuilt and finished

Your project

Start a similar conversation.

Enquire Back to projects