Before
After
Bathroom · Full refurbishment
Full bathroom refurb: strip-out, new shower enclosure, grey tiling, WC and wall-hung vanity.
This bathroom had reached the end of its life: tired sanitaryware, leaking around the shower, and finishes that could not be patched. The brief was a full refurbishment — strip back, reset the services, and rebuild to a clean, hard-wearing standard.
We took the room back to structure, replumbed, boarded and plastered, then fitted a new enclosure, grey timber-effect tiling, WC and wall-hung vanity. The finished bathroom is brighter, easier to keep and built to take daily use.
Works ran in a clear sequence: strip-out and first fix, then fabric, tiling and final fit-out, so each trade could finish without undoing the last.
The old bathroom was leaking and awkward to use. HASKO took it back to the walls and rebuilt it properly — the new shower and tiling make it feel like a different room.
Transformation
Drag the handle to compare this transformation.
Drag handle to compare
Before
After
Before
After
Before
After
Before
After