Before
After
Kitchen · Full refurbishment
Full rip out, new sub-floor installation, new electrics, new kitchen and tiling.
This kitchen needed a complete reset. The existing space showed long-term damp damage, tired fittings and services that could not support a modern layout — so the brief was a full rip out, not a cosmetic refresh.
We stripped the room back to structure, installed a new sub-floor, rewired for a contemporary kitchen layout, and rebuilt with moisture-resistant boarding before fitting a new kitchen and completing the tiling. The result is a bright, hard-wearing family kitchen with clean lines, practical storage and finishes that will hold up to daily use.
Works were sequenced carefully: demolition and services first, then floor and fabric, then joinery, appliances and final decoration — so each trade could finish cleanly without undoing the last.
We had lived with a damp, tired kitchen for years. HASKO stripped it back properly and gave us a room that finally feels solid, bright and easy to live with.
Transformation
Drag the handle to compare this transformation.
Drag handle to compare
Before
After
Before
After
Before
After
Before
After
Before
After
Before
After